logo
 header

Wharves

    back to References
  • residential projects puce-home residential buildings
Neder-Over-Heembeek Residential Project Bruyn West
wharf picture
In execution
Construction of 79 residential units and a multi-purpose hall.
client
O.C.M.W. Brussel
Architect
Pierre Blondel, architecten
engineering
MK Engineering
Contract sum
€ 11.269.683
Execution period
2010-2012
download project file: bruyn_west.pdf
Elsene Residential Complex Ernotte
wharf picture
In execution
Construction of 326 residential units (234 social and 82 average) with gardens, an underground car park for 82 vehicles and the environmental construction work.
client
Brusselse Gewestelijke Huisvestingsmaatschappij
Architect
Architectes Associés / BEAI
engineering
VK Engineering
technics
Axis-Engineering
Contract sum
€ 37.000.000
Execution period
2009-2011
download project file: ernotte.pdf
Anderlecht Bara residentieel
wharf picture
In execution
Construction of a residential project consisting of 4 buildings (B4, B5, B6, B7) with a total of 147 apartments. Building B4 has 1 underground level with 37 parking spaces and 2 garage boxes. Buildings B6 and B7 have 2 underground levels with a total of 107 parking spaces and 18 garage boxes.
client
Cityline (Immo BAM / GOMB)
Architect
DDS & Partners
technics
Studiebureau R. Boydens
Contract sum
€ 22.740.000
Execution period
2009-2011
download project file: bara_residentieel.pdf
Vorst Residential project Bervoets
wharf picture
In execution
Construction of 239 residential units with 191 underground parking spaces. The project is erected according to sustainable development criteria. The complex consists of 108 duplexes, 19 one-family dwellings and 112 apartments spread over 9 buildings. Heat (for heating and hot water) and electricity are generated by cogeneration, which allows for a significant energy saving.
client
Bervoets Real Estate
Architect
YATLAOL 55 (Y + Y, Atlante, Atelier 55, Eole)
Contract sum
€ 40.061.500
Execution period
2009-2011
download project file: bervoets.pdf
Ghent Student Accommodation Kantienberg
wharf picture
In execution
Construction of 4 blocks with a total of 656 student rooms, subdivided into standard rooms and comfort rooms. The complex has an underground floor accommodating, among other things, 121 car parking spaces and a shed for 1200 bicycles. Blocks A and D each have 4 above-ground floors, block C has 5 above-ground floors, and block B 6. The site has a total surface area of approx. 8,000m², the gross floor surface area is 27,000m². A total of 1.3 million bricks are needed for the brick facade.
client
BAM ppp
Architect
Huiswerk architecten
engineering
De Klerck engineering
Contract sum
€ 38.886.399
Execution period
2009-2011
download project file: kantienberg.pdf
Bruges Hanzepark, phases 1 and 2
wharf picture
Completion of the first two phases of a residential project situated at the Noorweegse Kaai in Bruges. The project is located on an old factory site with a surface area of approx. 30,600m². The first two phases cover the construction of three apartment blocks (A,B en H) with a total of 56 dwelling units. The total project consists of 8 residential buildings: 5 pavilions ’in the park’ and 3 residential buildings ’by the water’. The contract also includes the associated road and environmental construction work. .
client
THV Noorweegse Kaai (Immo BAM-ING RED)
Architect
Buro II
engineering
stablis
technics
Buro II
Contract sum
€ 7.595.037
Execution period
2008-2010
download project file: hanzepark.pdf
Rupelmonde The old shipyard
wharf picture
Construction of a residential project consisting of 2 apartment blocks (Atlas building: 23 apartments and 1 commercial space; Titaan building: 37 apartments) and an underground car park. General contract: rough construction, finishing and technical facilities.
client
ESV Scheepswerf Rupelmonde
Architect
THV Talboom-Wit
technics
De Smet-Verlinden & Van Staeyen
Contract sum
€ 10.500.000
Execution period
2007-2010
download project file: de_oude_scheepswerf_rupelmonde.pdf
Anderlecht Jorez
wharf picture
Construction of 2 blocks (34 apartments - 3 and 4 floors) (5 250 m²). Underground parking with 30 parking spaces. The project was realized in close collaboration with the Gewestelijke Ontwikkelingsmaatschappij Brussel (GOMB).
client
Immo Grana s.a
Architect
architectuurbureau Karel Lowette (Brussels)
stability
Raoul Thomas (Brussels)
Contract sum
€ 4.650.000
Execution period
2007-2009
download project file: jorez.pdf
Brussels River Side Residence
wharf picture
Construction of senior flats and apartments. The 2 residential blocks each consist of an underground floor (parking area), a ground floor and 6 floors.
client
River Side nv
Architect
Architecture + Corbiau
Contract sum
€ 3.513.103
Execution period
2007-2009
download project file: residentie_river_side.pdf
Anderlecht Bara De Lijn, building B1
wharf picture
Construction of a business complex (2,116m²). The ground floor accommodates workshops, the first floor will house offices. The building also has an underground car park for 14 vehicles.
client
Cityline (Immo BAM / GOMB)
Architect
DDS & Partners
stability
Establis
Contract sum
€ 3.072.893
Execution period
2007-2008
download project file: bara_gebouw_b1.pdf
Aalst De mouterij Residence
wharf picture
In execution
Construction of an apartment complex with underground parking, situated at Arbeidsstraat-Nieuwbeekstraat-Gentsestraat, in the centre of Aalst.
client
V.M.A.-Westhoek nv
Architect
Verdoodt & Verdoodt
Contract sum
€ 11.870.258
Execution period
2006-2010
download project file: de_mouterij.pdf
Evere Leonardo
wharf picture
The Leonardo complex at Evere consists of 35 apartments and 35 underground parking spaces.
client
Optima nv
Architect
Optima nv
stability
Studiebureau Van Wetter
Contract sum
€ 4.387.043
Execution period
2006-2007
download project file: leonardo.pdf
Braine-L'Alleud ‘Le Jardin du Môle’ Residence
wharf picture
Construction of a complex consisting of 36 apartments, 3 commercial spaces and an underground parking garage.
client
Westhoek nv
Contract sum
€ 3.677.206
Execution period
2005-2008
download project file: residentie_le_jardin_du_mole.pdf
Mechelen Social housing units ‘Oud Oefenplein’
wharf picture
Total project covering 58 social housing units. Renovation of 10 units, parts of which had to be retained.
client
De Mechelse Goedkope Woning
Architect
Pluymers Michel & Troniseck Chris
Contract sum
€ 6.103.666
Execution period
2005-2008
Anderlecht Les Acacias
wharf picture
In the immediate vicinity of the Westland Shopping Center the residential project ‘Les Acacias’ (18 000 m²) was realized. The complex consists of 116 apartments and a capacious underground parking. The project included also the infrastructural works between the buildings.
client
De Meyer nv
Architect
Bontinck G+D Studiegroep
Contract sum
€ 12.050.000
Execution period
2005-2007
download project file: les_acacias.pdf
Brussels Euro Gardens Residence
wharf picture
Construction of an apartment block with a number of office spaces. The complex consists of three underground floors (parking garage), an intermediate level, a ground floor and 8 floors. The contract covered the rough structure and delivery of the project in a wind and waterproof condition.
client
Euro Garden n.v.
Architect
Farber Christian
Contract sum
€ 4.703.975
Execution period
2005-2007
download project file: residentie_eurogardens.pdf
Knokke - Heist Long Beach Residence
wharf picture
New building project of high standing in the heart of Knokke, at the Kustlaan. Completion of the rough construction work. The complex consists of commercial spaces on the ground floor and three floors of apartments. The building also has an underground car park.
client
HTTP Hoprom
Architect
Architectenbureau Project
Contract sum
€ 3.244.985
Execution period
2005-2007
download project file: residentie_long_beach.pdf
Braine-L'alleud Les Sables
wharf picture
The residential complex ‘Les sables’ is made up of 95 luxury apartments, a commercial zone and an underground parking.
client
De Meyer nv
Architect
Montois Partners Arch. Bureau
Contract sum
€ 14.552.000
Execution period
2004-2008
download project file: les_sables.pdf
Ghent De Ark
wharf picture
Construction of a residential complex with 64 apartments, 1 commercial space and an underground car park with 83 parking spaces for cars. The residential site was olso provided with an attractive park and water feature.
client
De Meyer nv
Architect
Bontinck G+D Studiegroep
Contract sum
€ 10.858.967
Execution period
2004-2007
download project file: de_ark.pdf
Brussels Magistrat
wharf picture
Construction of 34 apartments and a commercial zone at street level. There are also 2 underground parkings and storage spaces.
client
Cofyna nv
Architect
Lievens & Bert bvba
Contract sum
€ 6.400.000
Execution period
2004-2007
download project file: magistrat.pdf
Wezembeek-Oppem Sterrenveld
wharf picture
Ecological and sustainable renovation of the Sterrenveld building in the Ban-Eik district. Renovation from 89 to 60 apartments, a room for the ‘Kind en Preventie’ (Child and Prevention) non-profit association, conversion of the boiler room. Construction of a shopping area.
client
Gewestelijke maatschappij voor volks-huisvesting.
Architect
Quirynen en Jacobs
Contract sum
€ 10.415.642
Execution period
2004-2007
download project file: sterrenveld.pdf
Ghent Het Volk
wharf picture
On the former site of the printing office ‘Het volk’ 3 blocks with 149 apartments were built. There is also an underground parking. A new municipal park gives a green touch to the neighborhood.
client
De Meyer nv
Architect
Bontinck G+D Studiegroep
stability
Provoost Norbert bvba
Contract sum
€ 17.723.694
Execution period
2003-2006
download project file: het_volk_gent.pdf
Braine-L'alleud Le Jardin de Nôtre Dame
wharf picture
Construction of 82 apartments (2 blocks), 5 commercial areas on ground floor level and an underground parking. The project included also the planning of the garden.
client
De Meyer nv
Architect
ABSSIS
Contract sum
€ 9.917.628
Execution period
2003-2005
download project file: jardin_notre_dame.pdf
Boom Residence Rypens
wharf picture
A combined residential project (construction and renovation). The façades and tower of the former gristmill Rypens were completely restored and a new building was constructed near to the tower. The complex consists of 29 luxury apartments. Typical for the building is the masonry of the façades combined with a wooden covering. There is also a (half) underground parking for the residents. They also have a beautiful panoramic view on the Scheldt and a nearby natural park.
client
WILMA PROJECT DEVELOPMENT nv
Architect
Architectenburo Ro Berteloot
engineering
Studiebureel ARCH-TECO
stability
Studiebureel ARCH-TECO
Contract sum
€ 4.485.000
Execution period
2003-2005
download project file: residentie_rypens.pdf
Antwerp Koninklijk Entrepot
wharf picture
Construction of residential apartements and offices. The area (31 000 m²) consists of: 366 underground parking spaces on two levels (8 000 m²) 6 000 m² for commercial opportunities and offices on ground-floor level and + 1 85 (17 000 m²) residential apartments on the upper floors Architectonic grey concrete and bluestone was used to cover the façades. Structural works, façade covering works and site coordination.
client
CFP et Partenaires (Project²)
Architect
ELD Partnership cvba (design: architect Prof. H. Kohlhoff)
stability
Ney & Partners nv
technics
EDV
Contract sum
€ 12.395.149
Execution period
2002-2004
download project file: koninklijk_entrepot.pdf
SINT-PIETERS-WOLUWE Joli Bois
wharf picture
SINT-PIETERS-WOLUWE
client
Bernheim Real Estate nv
Architect
Atelier d’Art Urbain + Atelier
Contract sum
€ 11.800.000
Execution period
2002-2004
download project file: joli_bois.pdf
Elsene Appartement complex Strabed Immo
wharf picture
Construction of a complex consisting of 5 floors, apartments and a 3-level parking garage. The 9000m² parking garage consists of 2 underground levels and 1 surface level.
client
Strabed Immo nv
Architect
Trio, Brussel
Contract sum
€ 3.000.000
Execution period
2001-2003
download project file: strabed_immo_elsene.pdf
Halle Zennevallei Apartments
wharf picture
Renovation of 96 apartments in the Rodenemwijk at Halle.
client
Huisvesting Zennevallei cvba
Architect
Architectenbureau Quirijnen & Jacobs
Contract sum
€ 5.503.005
Execution period
2000-2004
download project file: appartementen_zennevallei.pdf
Leuven Sint maartensdal
wharf picture
Thorough renovation of tower 2 and 3 of the Leuven social housing district Sint-Maartensdal designed by Renaat Braem. Complete concrete repair of façade surface. 5,000 m² curtain façade combined with ceramic panel cladding, 500 m² aluminium internal cladding. Complete internal renovation to fulfil fire safety standards, e.g. compartmentalisation, escape routes, lift, fire fighting equipment, alarm
client
Dijledal cvba
Architect
Arch.venn. A33
engineering
Essa
stability
Constructor
Contract sum
€ 9.445.910
Execution period
2000-2002
download project file: sint-maartensdal.pdf
Ukkel Domaine de la Hêtraie
wharf picture
Marc Corbiau (architect) was responsible for the architectural design: he developed 48 residential apartments over 5 blocks in the middle of a green environment. Buildings A and B: 10 apartments (180 m²) - 4 floors Building C: 8 apartments (200 m²) - 3 floors Buildings D and E: 10 apartments (140 m²) - 5 floors Chinese granite was used for the façades. 100 cars can be parked in the underground parking linked with a tunnel between the two buildings.
client
Domaine de la Hêtraie n.v
Architect
Architecture & Corbiau
stability
Van Besien bvba
technics
Van Besien bvba
Contract sum
€ 11.751.849
Execution period
1999-2004
download project file: la_hetraie.pdf
Brussels Immo Grana
wharf picture
Demolition of existing buildings + construction of 2 apartment buildings (incl. shops + covered parking area) on the Nieuwe Graanmarkt in Brussels.
client
Immo Granna nv
Architect
A+U
stability
M & A Van Wetter
Contract sum
€ 8.526.695
Execution period
1999-2000
download project file: immo_grana.pdf
Brussels Sint-Michielswarande
wharf picture
Turnkey, multifunctional complex comprising : 1,000 underground parking spaces, 6,500 m² commercial gallery, 1.500 m² office space, 160 apartments divided over 5 buidings.
client
CSM nv
Architect
ALTA
engineering
H. Van Der Beken
stability
VFD
Contract sum
€ 27.578.155
Execution period
1998-2002
download project file: sint-michielswarande.pdf
Ghent Scheldeoord Residential Complex
wharf picture
Total renovation of a social housing complex dating from 1929, covering the conversion of 454 apartments to 302 new dwelling units. The starting point for the renovation was the preservation of a progressive work of architecture, erected in the Vienna style between both world wars. It was opted to restore the outer structure and to completely dismantle the inner structure for the sake of modern comfort.
client
Stad Gent - Dienst Huisvesting
Architect
R. Berteloot - W. Duytschaever
Contract sum
€ 9.576.836
Execution period
1996-1999
download project file: wooncomplex_scheldeoord.pdf
Ghent Hollainhof
wharf picture
Turn-key and social housing project: 15 blocks with 129 apartments and a crèche. It is situated near the river Scheldt and has a patio. There is also an underground parking for 84 cars.The ground-floor apartments have small inner courtyards (similar to the Beguinage (a kind of convent) a bit further).
client
Ghent Housing Association cv
Architect
Neutelings and Riendijk Bureau Bouwtechniek
stability
PPC
Contract sum
€ 7.723.400
Execution period
1996-1997
download project file: hollainhof.pdf
Ghent Chapter house
wharf picture
Renovation of a historic site in the heart of Ghent, with retention of the medieval cellar vaults, into commercial spaces and apartments. In addition, a two-level underground parking garage (40 places) was constructed
client
SINT-BAAFS n.v.
Architect
Ingenieursbureau G. Derveaux
stability
Ingenieursbureau G. Derveaux
Contract sum
€ 6.378.809
Execution period
1995-1997
download project file: kapittelhuis.pdf
back to References
 
© 2013 BAM Mat nv is a part of Royal BAM Group nv